Champlain Rail-Trail

Bow Arrow Drawbridge

MapBlast Map!
Brought to you by MapBlast! (Click on map to navigate)

Topo map from TopoZone Web Site USGS Topographic map of Bow Arrow Drawbridge

A pedestrian/bicycle ferry similar to the 1998 Rail Trail Ferry Demonstration at the Winooski River is planned as a replacement for the missing railroad drawbridge.


Sign images are from the Manual of Traffic Signs by Richard C. Moeur.

Updated on March 05, 2001 by Kenyon F. Karl <Webmaster@new-england-rail-trails.org>.
  Unintentional errors are likely!

Go to: